New collection mandates mean more separated food waste and more tonnes to move. Flexibuster™ lets councils and waste authorities digest it on site, close to where it arises — cutting transport, processing cost and reliance on third parties, while generating renewable energy and biofertiliser for the local community.
The economics and the law are moving the same direction: keeping food waste out of landfill is no longer optional — it’s a cost, compliance and reputation issue you can get ahead of.
Since 31 March 2025, England’s Simpler Recycling rules require every workplace to separate food waste from general waste (micro-firms follow by 2027). Wales and Scotland already mandate it — the collection contract is now unavoidable.
UK Landfill Tax rises every year and now sits well above £100 per tonne, with gate fees tracking it. Every tonne you process on site is money kept rather than paid away.
From 31 March 2026 councils must collect food waste weekly from all homes in England — driving the whole system toward capture and recovery, and demand for local processing.
Since 31 March 2025 every workplace in England must separate its food waste — Flexibuster turns that legal obligation into on-site energy instead of another rising collection contract.
Flexibuster is a containerised, plug-and-play anaerobic digester that installs at a depot, transfer station or community site — close to where the waste arises.
Your kitchen, canteen or production tonnes of food waste are loaded straight into the containerised unit — no sorting line, no off-site transport.
Built-in pasteurisation and state-of-the-art sensors break the waste down in a sealed, odour-free anaerobic process, monitored remotely 24/7.
The biogas produced runs a CHP engine that generates renewable electricity and heat you use on site — cutting both energy and disposal bills.
What’s left is a clean, nutrient-rich biofertiliser — closing the loop and improving soil instead of filling a landfill.
Built for the council or waste-authority operations lead: cut processing cost, reduce reliance on third-party providers, and avoid the storage and transport headache.
Digesting food waste locally removes the biggest operational pain — storing and hauling it long distances to a distant processor. It’s dealt with where it lands.
Large centralised AD plants are multi-year builds that need extensive permitting. Flexibuster is containerised and plug-and-play, so you add capacity in weeks, not years — and scale unit by unit.
Cut waste-processing costs and reliance on third-party providers while generating renewable energy and biofertiliser that stays in the community — a visible win for a sustainable municipality.
On-site anaerobic digestion is filling up with newcomers and flat-pack kits. Here’s what to check before you buy — and where Flexibuster is built to win.
A global fleet, operating across multiple countries for over a decade, has turned thousands of tonnes of food waste into renewable energy. Deployed, field-proven technology — not a pilot or a pitch.
Manufactured to ISO 9001, 14001 and 28001. Many newer entrants can’t show the same quality, environmental and security certification behind the unit.
Flexibuster runs itself and is monitored by SEaB 24/7 — a hands-off appliance, not a biogas plant you have to learn to operate and babysit.
Built-in pasteurisation makes it safe for hygiene-critical sites, and every unit yields both renewable energy and clean biofertiliser — not just volume reduction.
This is not a pilot. Flexibuster has been deployed and operating internationally for over a decade — at hospitals, food and beverage manufacturers, airports, universities and hotels, where hygiene, uptime and reliability are non-negotiable.
Deployed and operating internationally for over a decade — field-proven technology, not a lab prototype or a risky first install.
Award-winning climate technology, recognised by Blue Earth (BE100) and Envirotech 50, and manufactured to ISO 9001, 14001 and 28001.
Developed with the support of the EU’s Horizon programme and InnovateUK, and trusted across demanding, highly-regulated sectors.
Fast. Flexibuster is containerised and plug-and-play, so it installs in weeks rather than the multi-year programme a centralised plant requires — and you scale by adding units as collection volumes grow.
By digesting food waste locally, you cut the long-haul transport to a distant processor and reduce reliance on third-party gate fees. Tell us your tonnage and catchment and we’ll model the saving.
Yes. The units are designed for depots, transfer stations and community sites, run sealed and odour-free, and are remotely monitored — so they fit into existing operations.
Each unit generates renewable electricity and heat plus a nutrient-rich biofertiliser — energy and soil improvement that can stay within the community, supporting local sustainability goals.
Tell us about your collection volumes and sites and we’ll model the transport and processing saving, the energy generated, and how quickly you could deploy — With weekly household food-waste collections mandatory from 31 March 2026 and workplace separation already law, councils need somewhere for that tonnage to go — without long-haul transport or a multi-year AD build.